Six of seven participants completed a modeled records-request task without help. The concept was not deployed, so the result says nothing about municipal service performance.
Field notes
Field notes from the case studies
Each note names the project period, evidence, and limits behind the observation.
August–September 2026•OpenRecords
March–August 2026•PermitLite
Across two eight-week windows, follow-up for missing documents was recorded for 14 of 34 applications before the pilot and 8 of 39 after. The sample is small.
April–July 2026•FieldLog
During a five-week review, four inspectors created 63 reports; 19 began without stable service. All reached the central register eventually, and three needed a retry.
November 2025–April 2026•WaterStart
Request and call records covered 62 standard requests before launch and 70 after. The review measured administrative handling, not when water was physically connected.
June–October 2025•StreetSignal
Twelve-week service logs included 148 reports before launch and 161 after. Location clarification and time to route improved; repair speed was not measured.